Can You Lay Flooring Before Drywall
You need to be able to get to that area easily.
Can you lay flooring before drywall. This can be beneficial if you are wanting to insulate concrete from an electric floor heating system above it. Install flooring before you work on your walls because it s easy to damage paint and other wall materials. You ll find 54 in wide drywall at drywall suppliers or you can special order it from most home centers and lumberyards. If you haven t cleaned the studs with a solution of bleach i would do so before covering it up as it could have mold spores on it from your last flood that need to be killed.
Both drywall work and floor installation create a mess but drywall s mess far exceeds that of flooring. Any gaps that remain between the finish flooring and the drywall typically are hidden beneath base trim that sits at floor. Water damage prevention is active from both sides of the redgard membrane. The finish flooring can add 3 8 to 3 4 inch to the height of the floor.
Using redgard under floor and wall tile will create a barrier that will be undisturbed after the tile is installed and grouted. You can paint with pure freedom even using a paint sprayer and spillages rarely cause much damage. If the room is small enough and you do not mind getting on your knees you don t need to rent a floor sander you can use any power hand sander such as a random orbit sander. If you simply have no floor coverings yet and just a subfloor then you will greatly benefit by painting the walls and ceiling before refinishing the floors.
Tall consider ordering special 54 in wide sheets of drywall to avoid an extra horizontal joint. Install drywall on the walls before installing floor covering. Installation guides drywall installers use the floor as a guide to locate studs and electrical boxes. This recommendation does not apply to subfloor.
If you install the floor last however you can scrape and sweep the debris off the subfloor and then lay your new flooring without worry. Check with wedi schluter laticrete goboard or whichever manufacturer to see how they want their product installed over a concrete subfloor. Go with drywall as if you get more flooding or water damage you re going to have mold grow back there. In this case the decision is practically made for you already.
Redgard waterproofing membrane is an easy to install solution to prevent water leaks through horizontal and vertical installations. By putting in the drywall first you separate drywall and its dust from the flooring later on.